Implementation Guide
Leader Standard Work.
Leader standard work (LSW) is the set of recurring, checkable routines a leader runs to keep the daily management system alive: board checks, tier meetings, standard work observations, audits and coaching, written down with time budgets. It is coaching time at the process, not an inspection checklist. It lets the system survive vacations, promotions and bad quarters, because the routines belong to the role, not the person. Below: example cards for four levels and a free Excel template.
What leader standard work is, and is not
Operators have standard work because their process is repeatable. Leaders have a repeatable process too: check the board, run the meeting, observe a standard, audit a zone, coach a person. Leader standard work writes that repeatable part down as a routine card: a one-page list of recurring tasks with frequencies and time budgets, visible at the board, checkable by the level above.
What it is not: a script for the whole day, and not an inspection checklist. A supervisor whose card fills every minute has no capacity left for the day's actual problems, and a card built around catching people produces exactly the defensive floor it deserves. The content of good LSW is overwhelmingly coaching and checking the process: watching real cycles against the standard, asking questions at the board, closing the loop on escalations. It is coaching time at the process, written down so it survives pressure.
Scope note: this page covers the leader routines themselves. The meeting cascade those routines protect has its own guide, tier meetings, and the surrounding operating system, boards plus meetings plus problem solving, is covered in lean daily management.
Where LSW sits in the transformation roadmap
On the TeamGuru deployment roadmap, leader standard work is its own practice in the Run stage, and it comes after daily management exists, because the routines are mostly about maintaining the boards, meetings and standards the earlier practices created. It runs in parallel with standard work and 5S, whose audits live inside the leader cards, and it feeds structured problem solving with what the checks surface.
- Before Daily Management
- You are here Leader Standard Work
- In parallel Standard Work & 5S
- After Structured Problem Solving
Why systems decay without it
Every daily management system is one leadership change from extinction unless its maintenance is explicit. That sounds dramatic until you run the three tests. The vacation test: does the tier meeting keep its standard for the two weeks the area manager is away? The promotion test: when the supervisor who built the board moves up, does the next one inherit routines or just a job title? The bad quarter test: when volume drops and everyone is firefighting, is coaching time the first thing sacrificed?
Systems that fail these tests were never systems; they were the personal habits of a few good leaders. Habits do not transfer. Routines written down with time budgets do, because the successor gets the card on day one, the boss can see whether the routines ran, and a bad quarter has to argue with a visible standard instead of quietly eating it. This is the real job of LSW: it converts the management system's maintenance from a personality trait into a property of the organization.
Do not start leader standard work when:
- There is no daily management system yet. LSW maintains a system; if there are no boards and no tier meetings, there is nothing to check and the card fills up with invented inspections. Build the daily rhythm first.
- Leaders' calendars are not protected. If meetings called from above routinely cannibalize floor time, the card becomes fiction by day three. Fix the calendar conflict before printing cards.
- The intent is surveillance, not coaching. If the plan is to feed completion data into performance ratings, stop: you will get perfectly ticked cards and an unmaintained system.
How to build a routine card
A routine card takes an afternoon to draft and two weeks to make honest. The sequence matters more than the template: derive the content from what the daily management system needs, let the leader write it, and make sure the boss is running one too.
Start from the system's needs, not the calendar
List what the daily management system requires to stay alive: which boards must be checked and when, which meetings must be run or attended, which standards and 5S zones need a recurring audit, which operators need coaching this quarter. The routine card is the maintenance schedule of the management system, so its content comes from the system, not from how the leader currently spends time.
Draft the card with the leader, not for them
The leader writes their own card against that list in a 30-minute working session, with someone keeping the format consistent. One page, each routine with a frequency and a time budget. A card handed down from the CI office gets complied with for a month; a card the leader wrote gets defended.
Pilot for two weeks, then cut
Every first draft is too full. Run it for two weeks, mark what was missed and why, then cut, retime and resequence. The test is a bad day: if the card cannot survive a breakdown morning, it is a wish list, not standard work.
Launch one level above the level you want to change
The common advice is supervisors first, because their day is the most repeatable. That is half right: their cards carry the most standard time, but a supervisor-only pilot fails the first week the area manager pulls them into unplanned meetings and never carries a card themselves. Start the pilot one level up: when supervisors get cards, their manager runs one from day one, and the content cascades upward, because each level's card exists largely to check and coach the level below.
Leave the rest of the day explicitly unscripted
The card covers the repeatable part of leadership. The remainder is for the day's actual problems, and it is planned free capacity, not slack. A card that schedules 100 percent of the day dies on contact with reality.
Leader standard work examples by role
The four cards below are illustrative but realistic, drawn for the same 450-person components manufacturer used across the transformation roadmap: 456 units per day, day shift at 6:00, tier 1 at 6:45, tier 2 at 7:15, tier 3 at 8:00. Notice the pattern as the level rises: fewer daily items, more auditing of the level below, and every card contains the routines that check someone else's routines. The tag under each routine names the board, KPI or document it checks. A routine that checks nothing is a calendar entry, not standard work.
Team leader: the cell's daily card
| Frequency | Routine | Time budget |
|---|---|---|
| Daily | Start-up check at the cell: staffing against the skills matrix, materials at the line, first-piece check signed Checks: Skills matrix | 5:50 to 6:05 |
| Daily | Hour-by-hour board: actual against plan written every hour, a reason next to every miss Checks: Hour-by-hour board | 8 x 2 min |
| Daily | Update the team's SQDIP board with yesterday's numbers and open actions before tier 1 Checks: SQDIP board | 6:30 to 6:45 |
| Daily | Attend tier 1, bring the cell's problems and leave with an owner for each Checks: Tier 1 meeting | 6:45 to 7:00 |
| Daily | Two standard work checks: one full cycle at one station against the standard work sheet, with the operator Checks: Standard work sheet | 2 x 10 min |
| Daily | Shift-end handover at the board: open problems, machine status, quality alerts, written for the next team leader Checks: Handover log | 15 min |
| Weekly | Train one operator on a new station with the job instruction breakdown, then update the skills matrix Checks: Skills matrix | 30 min |
Under two hours of named routines, yet the team leader's day runs to a standard more than anyone else's: relief, line support and andon response are standardized too, they just do not fit on a card with fixed times.
Shift supervisor: the daily card
| Frequency | Routine | Time budget |
|---|---|---|
| Daily | Board and staffing check before tier 1: yesterday's numbers on the SQDIP board, safety scan of the line, coverage for absences confirmed Checks: SQDIP board | 6:15 to 6:40 |
| Daily | Run tier 1 at the team board: deviations, actions, escalations Checks: Tier 1 meeting | 6:45 to 7:00 |
| Daily | Attend area tier 2, carry the team's escalations up and bring answers back Checks: Tier 2 meeting | 7:15 to 7:35 |
| Daily | Two standard work observations: watch one full cycle each against the standard sheet, notes about the process, never the person Checks: Standard work sheet | 2 x 15 min |
| Daily | One 5S zone check against the zone's photo standard, findings become actions Checks: 5S zone standard | 10 min |
| Daily | Coach one operator: one skill from the training plan, questions before answers Checks: Skills matrix | 20 min |
| Daily | Shift close: today's actions closed or carried over with a reason, handover written for the next shift Checks: Action list | 15 min |
About two and a quarter hours of named routines per shift. With recurring but variable work added, escalation responses, planned trainings, shift start and end, the structured share of a supervisor's day lands near 70 percent, and the rest is deliberately open.
Area or value stream manager
| Frequency | Routine | Time budget |
|---|---|---|
| Daily | Run tier 2: reds and escalations by exception; every new escalation leaves with an owner and a response time Checks: Tier 2 board | 7:15 to 7:35 |
| Daily | Attend site tier 3, report by exception, carry decisions back down the same day Checks: Tier 3 meeting | 8:00 to 8:30 |
| Weekly | Audit one tier 1 as a silent observer against the meeting checklist, then coach the facilitator afterward, never during the meeting Checks: Tier 1 meeting checklist | 30 min |
| Weekly | One themed gemba walk: one waste, one standard or one flow, ending with exactly one follow-up the walker owns Checks: Gemba walk notes | 45 min |
| Weekly | Escalation aging review: anything without an owner after 48 hours, or unanswered after a week, goes to tier 3 Checks: Escalation list | 20 min |
| Weekly | Attainment review with each supervisor: what was missed, why, and whether the card needs changing Checks: Supervisors' monthly attainment | 15 min |
About 50 minutes of fixed daily routines plus roughly two hours of weekly ones. The weekly items are the heart of the card: they are what keeps four tier 1 meetings honest without the manager attending all of them.
Plant manager
| Frequency | Routine | Time budget |
|---|---|---|
| Daily | Run tier 3: site trends, top escalations, decisions that need authority or money, priorities down Checks: Site KPI board | 8:00 to 8:30 |
| Weekly | One full cascade walk: attend a tier 1 at 6:45, follow one of its escalations through tier 2 and into tier 3 the same morning Checks: Escalation path | 90 min |
| Weekly | Attainment across areas reviewed at tier 3: misses treated as signals about the system, not verdicts on people Checks: Monthly attainment by area | 10 min |
| Monthly | Audit the auditors: join one area manager's tier 1 audit, compare notes afterward, check that the checks are real Checks: Tier 1 audit record | 60 min |
| Monthly | Revise own card: drop routines that no longer earn their time, add what the system now needs Checks: Own routine card | 20 min |
The plant manager's card is the shortest and the most visible. When it slips, every level below learns what the real priorities are, which is why the weekly cascade walk is the one item that should survive any week.
Free leader standard work template (Excel)
One sheet is your card for the month: each routine with its frequency, weekday, time budget and what it checks, then a column per day. Mark each due day D (done), X (not done) or N (not needed this time), and the sheet counts what was due and shows the monthly attainment of every routine. A due day left blank counts as not done. Also inside: a marked example month for an area manager and all four example cards by role.
Download the LSW template (.xlsx)Free, no email needed. Opens in Excel, or in Google Sheets through File, Import. The first routine on the supervisor card checks the team board; for that board, try the free SQDIP board template.
How much of the day to standardize
The share of a leader's time that runs on standard work falls as the level rises, because judgment work grows. These figures count all recurring structured work, meetings, checks, observations, coaching and reviews, with the routine card as the checkable core.
| Level | Standard share | What fills it |
|---|---|---|
| Team leader | Around 80 to 90 percent | Start-up checks, hour-by-hour board, board update before tier 1, standard work checks, relief and training, handover |
| Shift supervisor | Around 70 percent | Tier 1 and 2, board checks, standard work observations, 5S checks, coaching, handover |
| Area or value stream manager | Around half | Tier 2 and 3, tier 1 audits, themed gemba walks, escalation and attainment reviews |
| Plant manager | Around 30 percent | Tier 3, cascade walks, audits of the audit layer, monthly reviews and card revisions |
The figures most often quoted come from David Mann's Creating a Lean Culture and run higher: nearly all of a team leader's day, about 80 percent for a supervisor, half for a value stream manager and a quarter or less for a plant manager. The numbers here are lower at the supervisor level on purpose, because a first card that leaves room for the day's problems survives its first bad week.
Treat either set as starting points, not law. Calibrate over the first quarter against what the misses tell you, and remember the goal was never a percentage: it is that the routines that keep the system alive are explicit, visible and checked.
Coaching without micromanaging
The fastest way to kill LSW is to run the routines as inspections. A supervisor who arrives at a station with a clipboard and leaves with a list of corrections has taught the crew to perform for the clipboard. Every observation on the card is about the process, never the person: the question is whether the standard is followable and followed, and a deviation is data about the standard as often as it is data about training.
The working posture is questions before answers, the same discipline that gemba walks formalize. Five behaviors keep the routine on the right side of the line:
- Say what you are there to see before you start watching. An unannounced observation reads as a trap, and a trapped operator shows you a performance, not the process.
- Watch a full cycle before saying anything. Fragments produce verdicts; whole cycles produce questions.
- Ask what gets in the operator's way, and write the answer down where they can see it become an action.
- Correct nothing mid-cycle except a safety risk. Everything else waits for the standard sheet and a conversation.
- Leave one question behind, not five instructions. The routine is repeatable; the teaching compounds.
Measuring LSW: monthly attainment
Completion must be visible, or the practice quietly dissolves: the card lives at the board or in a shared system, ticked as the day goes, readable by anyone. Misses are reviewed weekly one level up and across the site at tier 3, and the question is always diagnostic: what displaced the routine? A calendar conflict points at the meeting culture, chronic overload points at a card that needs cutting, and a pattern of one level's misses usually means the level above is consuming their time.
Two rules keep the data honest. First, completion is never weaponized: the moment ticks feed performance ratings, every card turns green and the signal dies. Second, distrust perfection: sustained 100 percent completion means the card is too easy or the ticks are fiction. A healthy card runs at roughly 80 to 90 percent, with the misses explained and the card revised when the same miss repeats.
The number that carries this is monthly attainment: for each routine, the share of its due occurrences this month that were done or deliberately not needed. Mark every due occurrence one of three ways: done, not done, or not needed this time. The third mark is for a routine with no reason to run, a line that stood still or a plant closed for the holiday, never for a busy day; a busy day is a miss.
Monthly attainment = (done + not needed) / due occurrences
Example: an area manager's tier 1 audit is due every Tuesday, four times in November. It ran three times and was missed once, so its attainment is 75 percent. Across the whole card the same month comes to 91 percent, the worked example in the free template above.
Count a due occurrence nobody marked as not done. Otherwise the leaders who forget to mark look better than the ones who mark their misses honestly, and the number rewards the wrong habit. Read attainment per routine before reading the total: a card at 90 percent can hide one routine at 40 percent that nobody wants to run, and that routine is the conversation worth having.
Common failure modes
LSW rarely fails at launch. It fails in month three, in four predictable ways, and each has a countermeasure that belongs in the design rather than in a rescue effort.
Cards written by the CI office
The format is beautiful and the ownership is zero. Leaders comply for a month, then the cards migrate to a drawer. The countermeasure is authorship: the leader drafts, the CI office only keeps the format consistent and asks whether the system's needs are covered.
The 100 percent scripted day
A card that plans every minute collapses on the first breakdown, and one visible collapse discredits the whole practice. Standard work covers the repeatable part of the role; the unscripted remainder is where the day's real problems get worked, and it is protected on purpose.
Checklist theater
Ticks appear, observations do not. The tell is a check that never finds anything: that item is either a solved problem to retire or a fiction to confront. Audit the auditors monthly and ask about the last finding, not the last tick.
No revision in a year
A card that has not changed in a year is not being used, because the system under it has changed. Revision is part of the routine itself: each leader reviews their own card monthly and retires items the way 5S retires unused tools.
What happens next
Once the cards run, they become the sustain mechanism for everything built before them. The weekly zone checks and observation routines are what keep 5S and standardized work from decaying into laminated history, and as the plant matures, the audit items on the cards grow into a full layered process audit program. What the checks surface, repeat deviations, standards that cannot be followed, coaching gaps, feeds structured problem solving, the next practice on the roadmap.
The practical burden of LSW is scheduling and visibility: dozens of leaders, each with daily, weekly and monthly routines, findings that must become actions, completion that must be honest across three levels. The spreadsheet carries one leader's month well; it starts to strain when forty leaders each keep their own copy. This is where TeamGuru carries the practice: in the leader standard work use case each routine is scheduled daily, weekly, monthly or yearly, its owner can get a reminder before it is due, and it links to the metric or document it checks. Each occurrence is marked done, not done or not needed this time, and every routine shows its monthly attainment. A gemba walk is one of those recurring routines, and findings go onto the document's action list with owners and dates.
Take this with you
The diagram from this guide as a shareable image, free to reuse in internal training and workshops.
Download PNGFrequently asked questions
What are examples of leader standard work?
What should a leader standard work template include?
What percentage of a leader's day should be standard work?
How is leader standard work different from a to-do list?
Who should write the routine cards?
Should routine cards be paper or digital?
How do we start leader standard work?
What happens when leaders skip their routines?